首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Research on Early Concrete Crack Control of Shijiazhuang Subway Construction in Winter
【24h】

Research on Early Concrete Crack Control of Shijiazhuang Subway Construction in Winter

机译:冬季石家庄地铁建​​设早期混凝土裂纹控制研究

获取原文

摘要

The control of concrete cracking is a complicated and difficult problem for civil engineering. It is more difficult to control the cracking of the concrete poured in the winter. Thorough the analysis of the construction of the Shijiazhuang subway in winter, several methods are integrally applied. Frost proof and decreasing the temperature stress of concrete is considered together. The construction quality of the concrete arrive a satisfied level and the cracking of the concrete is successfully handled.
机译:控制混凝土裂缝是土木工程的复杂和困难的问题。更难以控制在冬季浇注的混凝土的开裂。彻底分析了冬季石家庄地铁建​​设的分析,一体地应用了几种方法。将混凝土的霜迹和减少在一起。混凝土的施工质量到达满足水平,并成功处理混凝土的开裂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号