首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Analysis of the results of pile trial for the subsidiary high-rise building of the Shandong Provincial Center for Culture and Art
【24h】

Analysis of the results of pile trial for the subsidiary high-rise building of the Shandong Provincial Center for Culture and Art

机译:山东省文化艺术中心附属高层建筑桩审判成果分析

获取原文

摘要

The high-rise towers and podium of the Shandong Provincial Center for Culture and Art adopt post-grouting drilling bored pile(pressure loaded pile)and compaction-under reamed bored pile(uplift pile) respectively. Based on an off-site self-balanced static-load test of the two kinds of piles, the bearing capacity, displacement, technology for pile-forming, construction period, and engineering cost are presented in detail, and the design basis for the two piles obtaining high bearing capacity on soft soil is also preliminarily put forward. The results of this study provides a design reference for the similar projects in the western new district of Jinan City.
机译:山东省文化中心的高层塔楼和领奖台采用后灌浆钻孔钻孔(压力负荷桩)和压实 - 在铰孔钻孔桩(隆起桩)下。基于两种桩的非现场自平衡静载试验,详细介绍了桩成型,施工期,工程成本的承载力,位移,技术成本,以及两者的设计基础还初步提出了获得软土的高承载能力的桩。本研究的结果为济南市西部的类似项目提供了设计参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号