首页> 外国专利> CONSTRUCTION METHOD OF WALL STRUCTURE BUILDING SUCH AS APARTMENT BUILDING, HIGH-RISE RESIDENTIAL BUILDING, STUDIO BUILDING, AND KNOWLEDGE INDUSTRY CENTER

CONSTRUCTION METHOD OF WALL STRUCTURE BUILDING SUCH AS APARTMENT BUILDING, HIGH-RISE RESIDENTIAL BUILDING, STUDIO BUILDING, AND KNOWLEDGE INDUSTRY CENTER

机译:诸如公寓楼,高层住宅楼,书房楼和知识产业中心之类的墙结构建筑的施工方法

摘要

The present invention relates to a construction method which reduces a construction scale by dividing a plane of a floor of a building to expedite framework construction to shorten construction time in construction having a wall structure such as an apartment building, a high-rise residential building, a studio building, and a knowledge industry center. Also, the present invention relates to finishing of a framework in a four-day cycle by dividing two buildings into four zones and performing construction by a difference of one day. According to the present invention, the construction method of a wall structure building such as an apartment building and a high-rise residential building comprises: a first step of plane division of dividing a plurality of households on a plane of a building into two or more zones (construction areas); a second step of wall construction of constructing a wall form, a wall reinforcing bar, and wall electric equipment for the first zone (area) of the first step; a third step of slab construction of pouring slab form, slab reinforcing bar, electric equipment, inspection and slab concrete after the second step; and a fourth step of performing the second step of wall construction and the third step of slab construction by a time difference with the first zone (area) for the second zone (area) of the first step. The second, the third, and the fourth step are repeated on an upper floor.;COPYRIGHT KIPO 2019
机译:[0001]本发明涉及一种通过分割建筑物的地板的平面以加快框架结构以缩短在具有墙壁结构的诸如公寓楼,高层住宅楼的建筑中的建造时间而减少建筑规模的建造方法,一间工作室大楼和一个知识产业中心。另外,本发明涉及通过将两栋建筑物划分为四个区域并且相隔一天的差额进行施工以四天的周期完成框架。根据本发明,诸如公寓建筑物和高层住宅建筑物之类的墙壁结构建筑物的建造方法包括:平面划分的第一步,将建筑物平面上的多个住户分为两个或更多。区域(建筑区域);墙壁施工的第二步骤,即为第一步的第一区域(区域)构造墙壁模板,墙壁钢筋和墙壁电气设备。第二步,浇筑平板模板,平板钢筋,电气设备,检查和平板混凝土的平板建设的第三步;第四步骤,通过与第一步骤的第一区域(区域)之间的时间差,执行壁结构的第二步骤和平板结构的第三步骤。在上层重复第二,第三和第四步。; COPYRIGHT KIPO 2019

著录项

  • 公开/公告号KR20190038984A

    专利类型

  • 公开/公告日2019-04-10

    原文格式PDF

  • 申请/专利权人 HAN BONG KIL;

    申请/专利号KR20180041575

  • 发明设计人 HAN BONG KILKR;

    申请日2018-04-10

  • 分类号E04G11/06;

  • 国家 KR

  • 入库时间 2022-08-21 11:51:12