首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Research on cable force testing method of cable-stayed bridge model test
【24h】

Research on cable force testing method of cable-stayed bridge model test

机译:斜拉桥模型试验的电缆力测试方法研究

获取原文

摘要

A new method of measurement of the cable force in cable-stayed bridge model test is introduced. Pressure ring sensor is used as the main component in this method and the tension of the stay cables can be measured real-time and in time. It is verified that this method is exact and credible by model test and can be used in actual cable-stayed bridge. The static measurements for the test model are conducted. The testing results are compared with the numerical results of finite element model developed for the test model. A platform is established for the future researches.
机译:介绍了电缆稳定桥模型试验中电缆力的新方法。压力环传感器用作该方法中的主要部件,并且可以实时和及时测量支架电缆的张力。验证了该方法通过模型测试精确且可信,可用于实际的斜拉桥。进行测试模型的静态测量。将测试结果与用于测试模型开发的有限元模型的数值结果进行比较。为未来的研究建立了一个平台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号