首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Assessment of Risks during Large-span Steel Truss Arch Bridge Construction
【24h】

Assessment of Risks during Large-span Steel Truss Arch Bridge Construction

机译:大跨度钢桁架拱桥建设中的风险评估

获取原文

摘要

Chongqing Chaotianmen Bridge is by far the world's largest three-span continuous half-through double-layer steel truss tied arch bridge. Risk evaluation and risk analysis are made to the bridge during construction period. At the same time, various measures are taken to avoid construction risks and accidents. The principal line of risk controls is clear with reasonable control measures. Chongqing Chaotianmen Bridge was completed and available for traffic on April 29, 2009, its various technical and quality indicators are in accordance with design and specifications.
机译:重庆查加代门桥是迄今为止世界上最大的三跨连续半透双层钢桁架绑拱桥。施工期间对桥梁进行风险评估和风险分析。与此同时,采取各种措施来避免建设风险和事故。有合理的控制措施,风险控制的主要规则是明确的。 2009年4月29日,重庆Chaotianmen Bridge完成并提供交通,其各种技术和质量指标符合设计和规范。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号