The review of project management based on the theory of constraints and critical chain

机译:基于限制理论和关键链的项目管理审查

获取原文

摘要

The relationship between precedence and successor activities is the only factor that determined the project scheduling in the traditional project scheduling management. The critical chain-an elegant solution, on the other hand, takes resource limitations into account and is composed of sections that are dependent on successor relationships and other sections that are dependent on resource constraint. By integrating the existing research findings, it is the objective of this paper to highlight the merits and pitfalls of the CCPM scheduling method, such as the principle for project delays, the critical chain identification; the time buffer setting and project scheduling with limited capacity of a resource. Furthermore, it also presidents the difficulties when implementing the critical chain approach and conclude with a description of our ongoing research direction.
机译:优先级和继承活动之间的关系是唯一确定传统项目调度管理中项目调度的因素。另一方面,关键链 - 一个优雅的解决方案考虑资源限制,并由依赖于继承关系的部分和依赖资源限制的部分组成。通过整合现有的研究发现,本文的目的是突出CCPM调度方法的优点和陷阱,例如项目延误原理,关键链识别;时间缓冲区设置和项目调度,资源容量有限。此外,它还在实施临界链方法时,并在持续的研究方向的描述中总统达成困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号