首页> 外文会议>International Conference on Energy and Environmental Protection >Brief Analysis of the Technical Points about the Tailings Pond Environmental Impact Assessment
【24h】

Brief Analysis of the Technical Points about the Tailings Pond Environmental Impact Assessment

机译:浅析尾矿池塘环境影响评估的技术要点

获取原文

摘要

In recent years, mine tailings dam incidents occur frequently all over China, causing serious loss of life and property as well as posing a serious threat to environmental safety. Tailings pond as the most important part of mineral areas, the environmental impact assessment (EIA) of which is the emphasis and difficulty of mine areas EIA. Relevant authorities of China have paid great attention to the life cycle of tailings pond, environmental impact assessment also calls for special attention. In the view of the fact that separate tailings pond EIA is rare, generally including in the mining and processing project EIA, this paper started from survey and design time, construction period, operation period and closure period over the life cycle of the tailings pond, and then discussed the technical points of the main environmental impact relative to the corresponding period. The environmental protection measures and risk prevention measures were also put forward.
机译:近年来,矿山尾矿大坝事件经常发生在中国,造成严重损失的生命和财产,并对环境安全构成严重威胁。尾矿池是矿物地区最重要的部分,环境影响评估(EIA)的重点和难度的矿区EIA。中国有关当局非常重视尾矿池的生命周期,环境影响评估还要求特别关注。鉴于单独的尾矿池塘EIA很少,通常包括在矿业和加工项目EIA中,本文从调查和设计时间,施工期,运营期和尾尾池的生命周期开始,然后讨论了相对于相应期间的主要环境影响的技术要点。还提出了环境保护措施和风险预防措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号