CONDITION AND RISK ASSESSMENT OF GRIFFITH G4 SEWER RISING MAIN

机译:GRIFFITH G4下水道升起的条件及风险评估

获取原文

摘要

Griffith City Council (GCC), in the NSW Riverina, has centralised their sewage treatment and has an extended network of series pumping and rising mains. The G4 SPS rising main is approximately 7.1 km long and was reportedly constructed in 2-3 phases from 1974 and 1991 from cast-iron and ductile Iron. The main travels alongside the main irrigation canal for a large proportion of its length, which also provides drinking water to the town. Previous failures, current low flow rates and high detention times, and high levels of hydrogen sulphide measured at the treatment plant inlet channel led GCC to initiate detailed condition and risk assessment of the main. KBR were engaged to review available operational and performance data, previous investigation reports, and undertake condition and risk assessment. External physical testing of the main including Broadband Electromagnetic scanning (BEM), physical inspection and spot ultrasonic testing at 30 representative and expected worst case locations. Bulk soil resistivity and transient pressure monitoring were also undertaken. Quantitative failure risk assessment and economic life modelling was undertaken by specialists WISER analysis. The findings validated the approach of point sampling with detailed scanning at regular intervals and high risk locations. The general rate of corrosion was found to be substantially lower than feared, but several critical points with significantly elevated risk or deterioration were identified due to local design features. A staged strategy was recommended involving condition monitoring, operational changes, and air valve relocation. The estimated cost of these measures over 5 years of approximately $100,000, providing a cost effective means of managing risk while deferring major rehabilitation or renewal works for a substantial period.
机译:格里菲斯市委员会(GCC),在新南威尔士州Riverina的,具有集中的污水处理,有一系列的抽吸和上升电源的扩展网络。 G4 SPS上升的主要是大约71.3公里,据报道,从1974年和1991年的铸铁和球墨铸铁的2-3阶段构建。主要的行进与主要灌溉运河沿着其长度的大部分,这也为镇上提供饮用水。以前的故障,当前低流量和高滞留时间,以及在治疗植物入口通道LED GCC时测量的高水平硫化氢,以启动主要的条件和风险评估。 KBR致力于审查可用的运营和绩效数据,以前的调查报告,并进行条件和风险评估。主要物理测试的主要物理测试包括宽带电磁扫描(BEM),30个代表和预期最差情况下的物理检测和点超声波检测。还进行了散装土壤电阻率和瞬态压力监测。通过专家更明智的分析进行了定量故障风险评估和经济生活建模。这些调查结果验证了点采样的方法,以定期间隔和高风险位置详细扫描。发现腐蚀的一般速率显着低于令人担忧,但由于局部设计特征,鉴定了几个具有明显升高或恶化的关键点。建议使用分阶段策略,涉及条件监测,操作变化和空气阀门搬迁。这些措施的估计成本超过5年的约100,000美元,提供了促进大量康复或更新工程的成本有效的管理风险手段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号