首页> 外文会议>International Conference on Advances in Materials and Manufacturing Processes >Numerical analysis on apeature of high-pressure water jet punching hole to preventing outburst
【24h】

Numerical analysis on apeature of high-pressure water jet punching hole to preventing outburst

机译:高压水喷射冲孔孔的分析,防止爆发

获取原文

摘要

As impacting and cutting role of the small jet, coal around slots occured violent displacement and expansion, increasing coal cracks, which greatly improved gas flow in coal seams and made for gas emission. The original coal stress changed and stress concentration belt moved to coal seams depth constantly. With gradual relief expansion and fracture increased, coal seam permeability coefficient increased, gas pressure decreased. Coal potentiality released, coal crushed and moved, a lot of gas with adsorption state changed free, then gas fully released and gas pressure gradient decreased, which reduced outstanding risk, it was determined that aperture size was 4/15 or so of roadway floor length using ANSYS finite element analysis software, thus roadway fissures developed full, and maintained rock integrity, in favor of speeding up the face driving.
机译:由于小型喷气机的影响和切割作用,煤炭周围的煤发生了剧烈的位移和膨胀,增加了煤裂缝,这大大提高了煤层中的气流并为气体排放而制造。原始煤胁迫改变和应力集中带不断地移动到煤层深度。随着逐步释放膨胀和断裂增加,煤层渗透系数增加,气体压力下降。煤炭潜力释放,煤粉碎和移动,吸附状态的大量气体变化不变,然后气体完全释放,气体压力梯度降低,这减少了出色的风险,确定光圈尺寸为4/15左右道路地板长度采用ANSYS有限元分析软件,从而发展巷道裂缝,并保持岩石完整性,有利于加快脸部驾驶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号