首页> 外文会议>International Conference on Civil Engineering and Transportation >A Monitoring Test Study on Soft Clay Treatment by Preloading with Plastic Drainage Pipe
【24h】

A Monitoring Test Study on Soft Clay Treatment by Preloading with Plastic Drainage Pipe

机译:用塑料排水管预加载软粘土处理的监测研究

获取原文

摘要

According to the monitoring results of soft clay treated by preloading with plastic drainage pipe, the consolidation settlement effect of soft clay with 50kPa preloading load, 21m plastic pipe, 1.2m and 1.5m distance was compared with that of 30kPa preloading load, 6m plastic pipe, 1.5m and 2.0m distance. The analysis showed that, the preloading method with deep plastic drainage pipe can accelerate the dissipation of excess pore water pressure in deep soft soil. The over-flow penetration may occur in the confined water. The elastic deformation appears and recoveries after unloading. This is not conducive to the consolidation of soft clay layer 4. The plastic drainage pipe whose depth and distance should be 18~20m and 1.5m respectively to the consolidation soft soil in Pudong.
机译:根据用塑料排水管预加载处理的软粘土的监测结果,与50kPa预载荷,21M塑料管,1.2M和1.5M距离的软粘土的固结沉降效果与30kPA预载荷,6M塑料管相比,1.5米和2.0米距离。分析表明,具有深层塑料排水管的预加载方法可以加速深软土壤中过量孔隙水压的耗散。过流渗透可能发生在狭窄的水中。卸载后出现弹性变形和回收。这不利于软粘土层的固结4.塑料排水管,其深度和距离应分别为浦东的固结软土18〜20米和1.5米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号