首页> 外文会议>International Conference on Civil Engineering and Transportation >Analysis and design of the tower pier anchor of steel tower cable stayed bridge
【24h】

Analysis and design of the tower pier anchor of steel tower cable stayed bridge

机译:钢塔电缆座桥塔墩锚杆的分析与设计

获取原文

摘要

The No.4 bridge of Erdos Wulanmulun River city is a steel-concrete composite beam of cable stayed bridge. The Twin Towers bridge with double cable planes, tower adopts steel bridge tower. This paper introduces the design of structural steel pylon pier anchor and computational analysis of the situation. This research achievement can provide us with a reliable reference for similar projects.
机译:武兰武兰河城河桥4号桥是一座钢混凝土综合梁的电缆停留桥。双塔桥梁有双缆车,塔采用钢桥塔。本文介绍了结构钢塔墩锚的设计和对情况的计算分析。这项研究成果可以为我们提供可靠的类似项目的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号