首页> 外文会议>International Conference on Civil Engineering and Transportation >Numerical simulations for bending moment distribution on linings of tunnel excavated by shield
【24h】

Numerical simulations for bending moment distribution on linings of tunnel excavated by shield

机译:屏蔽隧道衬砌弯矩分布的数值模拟

获取原文

摘要

In order to simulate moment distribution on linings of tunnel excavated by shield, FEM-based procedure is proposed. According to geological data of tunnel excavated by shield, FEM model is performed, and the moment, axial force and shear force distributions on linings are computed. The maximum moment on segments decreases while Poisson's ratio of soil materials touching to segments increases. The moment value and distribution vary with Young's modulus of soil materials. The maximum positive moment on linings is approximately equal to the maximum negative moment.
机译:为了模拟屏蔽挖掘出隧道衬里上的时刻分布,提出了有限手术。根据屏蔽挖掘出的隧道的地质数据,计算了有限元模型,并且计算了衬里上的轴向力和剪切力分布。段的最大瞬间降低,而泊松物质接触到区段的比例增加。瞬间的价值和分布随杨氏模量的土壤材料而变化。衬里上的最大正时刻大致等于最大负时刻。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号