首页> 外文会议>International Conference on Civil Engineering and Transportation >Analysis of the Working Characteristics of High-pile Wharf Pile Foundation under Berthing Load
【24h】

Analysis of the Working Characteristics of High-pile Wharf Pile Foundation under Berthing Load

机译:基于堆积载荷下高桩码头桩基础的工作特性分析

获取原文

摘要

In order to study the working characteristics of high-pile wharf pile foundation under berthing load, our team conducted the field test and established the numerical models. Analyzing the data from the test and models, the relationship between load and displacement of piles was deduced primarily. It's proven to be usability.
机译:为了研究在Berthing Load下的高桩码头桩基的工作特性,我们的团队进行了现场测试并建立了数值模型。分析来自测试和模型的数据,主要推断着桩的负荷与位移之间的关系。它被证明是可用性的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号