首页> 外文会议>International Conference on Structures and Building Materials >Design of Enclosure for Subway Station Foundation Pit in Southward Extension Line of Chengdu Metro Line One
【24h】

Design of Enclosure for Subway Station Foundation Pit in Southward Extension Line of Chengdu Metro Line One

机译:成都地铁线向南延伸线外壳地铁基坑外壳设计

获取原文

摘要

This paper summarizes the design of open-cut subway station in Chengdu Metro line one. The station is built by cut and cover method and divided into three special parts with four different cross-sections used for main line and transfer track. Such retaining techniques as bored piles, steel pipe struts, soil nails, rock-bolts, steel-meshes, shotcrete and anchored steel cables are comprehensively used to maintain the stability of foundation pit. The anti-buoyancy coefficient of the open cut station is also derived and attains the requirement of safety and stability for the foundation pit after the utilization of these enclosure measures. The application of the design and construction technique for the subway station may provide guidance for the building of analogous subway station under similar geological and hydrogeological conditions in Chengdu.
机译:本文总结了成都地铁线开放地铁站的设计。该电台采用剪切和覆盖方法构建,并分为三个特殊部件,具有四种不同的横截面,用于主线和转移轨道。这种固定技术作为钻孔桩,钢管支柱,土钉,岩螺栓,钢网,喷射和锚固钢电缆全面地用于保持基坑的稳定性。开口站的防浮力系数也得到得出,并在利用这些外壳措施后对基坑的安全性和稳定性的要求得到推导。地铁站设计和施工技术的应用可以为成都同类地质和水文地质条件下的类似地铁站建设的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号