首页> 外文会议>Society of Petroleum Engineers Unconventional Gas Conference >First Multi-Stage Swell Packers Open Hole Completion in Rub’ Al-Khali Empty Desert: Case Study
【24h】

First Multi-Stage Swell Packers Open Hole Completion in Rub’ Al-Khali Empty Desert: Case Study

机译:第一个多级膨胀包装机打开漏洞完成在Rub'Al-Khali空沙漠中:案例研究

获取原文

摘要

Many “poor” gas prospects-particularly ultralow-permeability and porosity unconventional rocks such as tight sand-become economic success when hydraulic fractures are created in the pay zone. The fractures allow a single well bore to contact many thousands of square feet reservoirs. Using swellable packer technology has mechanically simplified fracture job. Using multiple packers ensures the entire zone is treated; or in other words, knowing where the fracture fluid goes once it exits the casing, and how each set of fractures is isolated from another is a key in a successful hydraulic fracture design. Lukoil Saudi Arabia started an exploration campaign in the Rub’Al-Khali Empty Quarter in 2006 targeting Non Associated Gas and nine wildcat exploration wells have been drilled and evaluated. It was found during the early stages of the exploration that the gas accumulations in LUKOIL Saudi Arabia exploration Area (Block-A), were typically trapped in tight to ultra-tight reservoirs (see Fig. 1). These gas discoveries in the Empty Quarter have occurred in High Pressure and High Temperature (HPHT) horizons at depths between 12,000 and 20,000 ft, where the stress and temperature are extremely high in addition to micro-Darcy levels of reservoir permeability. This has made the exploration activity more challenging. To overcome the extreme challenges and to help assure the success of the exploration activities, a new completion strategy was implemented in the most recent well(Case Study). The synergy of the new strategy resulted in successfully running the first multi-stage swell packers open hole completion down to 19,251 ft and then performing staged fracturing treatment across the completion. As a result of this new adopted technology, LUKOIL Saudi announced the first Hydrocarbon Discover in Sarah Formation.
机译:许多“差”天然气前景 - 特别是超级渗透性和孔隙率,如在工资区中创建液压骨折时,如液压骨折时的严重砂变得经济成功。骨折允许单个孔接触数千个方形脚藏。使用可稳定的封隔器技术机械地简化了骨折工作。使用多个包装器可确保整个区域进行处理;或者换句话说,知道裂缝流体一旦离开壳体,并且每组裂缝是从另一组中分离的,是成功的液压骨折设计中的钥匙。 Lukoil Saudi Arabia于2006年开始探索摩擦 - 哈利空季度勘探活动,瞄准无关气体,钻探和评估九个野猫勘探井。在探索的早期阶段发现,卢基石油沙特阿拉伯勘探区(块A)的煤气积聚通常被捕获到超紧储层(见图1)。在空区中的这些气体发现在高压和高温(HPHT)视野中发生在12,000到20,000英尺之间的深度,其中除了微达西渗透性的微径水平之外,压力和温度非常高。这使得探索活动更具挑战性。为了克服极端挑战,并帮助确保勘探活动的成功,在最近的良好良好(案例研究)中实施了新的完工策略。新策略的协同作用导致成功运行第一个多级膨胀封装器打开孔完成至19,251英尺,然后在完成时进行分阶段压裂处理。由于这种新的采用技术,Lukoil Saudi宣布了莎拉形成的第一个碳氢化合物发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号