首页> 外文会议>International Conference on Advanced Design and Manufacturing Engineering >The Research on the Injection Interval's Reasonable Water Injection Rate for Multi-Layer Sandstone Oilfield at Ultra-High Water Cut Stage
【24h】

The Research on the Injection Interval's Reasonable Water Injection Rate for Multi-Layer Sandstone Oilfield at Ultra-High Water Cut Stage

机译:超高水切口多层砂岩油田注射间隔合理注水率的研究

获取原文

摘要

The oilfield of Daqing placanticline is a typical multi-layer sandstone oilfield, which water flooding production occupies over 50% of the total yield of Daqing oilfield, and it has made great contribution to oilfield stable production. For the average water cut is more than 94% at present, a finer potential tapping for water flooding is needed. In recent years, there is an increasing in interval subdivision of water injection wells, and the average number of intervals is 5 or more in each well. The determination of the injection interval's water injection rate has becoming a problem in that the difference of reservoir nature between intervals is great and the connectivity degree between injection wells and oil wells around is various. The water cut has not risen, meanwhile, the production has not reduced for 5 years in the fine potential tapping demonstration area of the water flooding oilfields in the placanticline, which has been the model of fine water flooding development effect. The reasonable water injection wells are optimized with the demonstration area as the object of analysis and the effect evaluation of oil and water wells as foundation. The rationality of water injection rate of intervals was evaluated based on the water injection efficiency, so as to optimize the reasonable injection interval. The correlation between water injection rate of each interval and the affecting factors was studied using grey correlation and cluster analysis. Then a functional relationship between the water injection rate and the main affecting factors was built using multiple regression. So that a method for the quantitative of water injection rate in intervals is provided. It is convenient to choose the parameters and the method has strong practicality. It has important significance for the extension of water injection optimization technology in the demonstration area.
机译:Daqing Pluicanticline的油田是一种典型的多层砂岩油田,水利产量占大庆油田总产量的50%以上,对油田稳定的生产作出了巨大贡献。对于平均水切割目前大于94%,需要进行水淹水的更精细的潜在攻丝。近年来,水注入孔的间隔细分越来越大,并且每个孔的平均间隔数为5或更多。注射间隔的注水速率的确定已经成为一个问题,因为间隔之间的储层性质的差异很大,注射孔和油井之间的连接程度是各种各样的。与此同时,水切口尚未上升,在促销品中的水洪水油田的精细潜在攻丝示范区,生产尚未减少5年,这是一直是细水洪水开发效果的模型。合理的注水井是用示范区优化的,作为分析对象和油水井的效果评估作为基础。基于注水效率评价水注射率的注水速率的合理性,以优化合理的注射间隔。使用灰色相关和聚类分析研究了每个间隔的水注射率和影响因子之间的相关性。然后使用多元回归建立注水速率与主要影响因素之间的功能关系。因此,提供了间隔地定量注水速率的方法。选择参数方便,该方法具有很强的实用性。它对示范区中注水优化技术延伸具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号