COMPLIANCE OF EIA APPROVAL CONDITIONS FOR KUALA LUMPUR-PUTRAJAYA-KLIA HIGHWAY PROJECT

机译:吉隆坡 - 普勒 - 普拉德拉贾亚 - 克利亚公路项目的符合欧洲联盟批准条件

获取原文

摘要

The study was to identify the compliance of Environmental Impact Assessment (EIA) Approval Conditions in terms of total suspended solids (TSS) discharges from the silt trap and in the rivers for Kuala Lumpur-Putrajaya-KLIA highway construction project, Malaysia. The data from August 2005 to May 2007 was obtained from Department of Environment, Kuala Lumpur. This project was chosen for the study because this project was among the early projects after the implementation of Erosion and Sediment Control Plan (ESCP). The highway cut across several rivers where a total of suspended solids (TSS) were measured at upstreams and downstreams with a total of twelve (12) stations. In addition, twelve (12) sampling stations for the silt trap discharges located along the rivers were also measured. The results have shown that fifteen (15) out of one hundred and thirty two (132) samplings for river stations recorded incompliance of about 11.4% and seven (7) out of fifty two (52) samplings for silt trap discharge stations recorded incompliance of about 13.5%.
机译:这项研究是确定从淤泥陷阱总悬浮固体(TSS)的排放方面,并在江河吉隆坡,布城,吉隆坡国际机场的公路建设项目,马来西亚环境影响评估(EIA)批准条件的合规性。该数据来自2005年8月至2007年5月由环境部,吉隆坡获得。该项目被选为研究,因为这个项目是侵蚀产沙控制计划(ESCP)实施后的早期项目之一。在几个河流公路切其中总悬浮固体(TSS)在上行流进行测量和总的十二(12)站下行流。此外,还测定12(12),用于沿着河流位于淤泥陷阱放电取样站。结果表明,15(15)出来的132(132),取样用于河流站所录的大约11.4%和七(7)遵医嘱出52(52),样品用淤陷阱卸货站记录的遵医嘱约13.5%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号