Electrical Planning and Interconnection of Large Offshore Wind Farm in Taean Korea

机译:泰恩朝鲜大海上风电场的电气规划与互连

获取原文

摘要

The proposed electrical layout for the 108 MW wind farm and grid connection is given in the study and it's chosen as the most cost effective solution for the site This is done in regards of wind, site location, choice/location of substation, internal cabling and the electrical grid connection to the main grid system. Furthermore existing European grid codes and corresponding performance/experience of existing offshore wind farms have been a reference point for the study.
机译:在研究中给出了108 MW风电场和电网连接的拟议电气布局,它选择作为现场最具成本效益的解决方案,这是在风,现场位置,变电站的选择/位置,内部布线和内部布线和电网连接到主电网系统。此外,现有的欧洲网格代码和现有海上风电场的相应性能/经验是该研究的参考点。