首页> 外文会议>International Yellow River forum >Discussion on Control Scheme of Ningxia - InnerMongolia Section of the Yellow River
【24h】

Discussion on Control Scheme of Ningxia - InnerMongolia Section of the Yellow River

机译:黄河宁夏控制方案探讨 - 黄河Innermongolia段

获取原文

摘要

Basing on the analysis of actuality of river channel projects in Ningxia — Inner Mongolia section of Yellow River, this paper indicates that the regulation object and scheme of this section should be different from the ones of lower Yellow River. It is proposed that raising, strengthening and protection of dikes and layout adjustment of dangerous works should be insisted on. Meanwhile, different opinions about Qinhe River are also put forward. As a core, the author suggests that reasonable regulation schemes and objects for different sectiones of a river or different rivers should all he established according to different particularities and requirements.
机译:宁夏 - 内蒙古河道项目现状分析黄河,本文表明,本节的调节对象和方案应与下黄河中的规例和方案不同。建议应坚持提高,加强和保护堤坝和危险作品的布局调整。与此同时,关于秦河的不同意见也提出。作为一家核心,提交人建议河流或不同河流的不同切片的合理调节计划和对象应该根据不同的特殊性和要求建立。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号