RISK ASSESSMENT OF CORBELS IN BUTTRESS DAMS

机译:支撑水坝Corbels风险评估

获取原文

摘要

Most of the buttress dams currently in service today were designed and constructed between fifty and one hundred years ago. Not surprisingly, these older designs often do not meet present day requirements for the design of reinforced concrete sections. This is often the case with the corbels that support the slabs or arches in buttress dams. The corbels for buttress dams were typically not constructed with sufficient reinforcing steel to meet the ductility requirements of modern reinforced concrete codes. Under-reinforced corbels can fail in a sudden (brittle), unpredictable manner. If a corbel were to fail, it could result in loss of support for the upstream slab or arch, which would result in a breach of the dam. Therefore, a failure mode involving a corbel can have a significant impact on the overall safety of the dam. As a result, costly and potentially disruptive rehabilitation may be needed to provide the necessary degree of safety. The state of the practice in dam engineering is moving towards a risk-based approach to evaluating structures. This technique compares the risk of failure against the consequences of failure. Where a relatively low tolerance for risk exists, the contribution of risk from the corbels may be unacceptable, and changes in dam operation or rehabilitation of the corbels may be considered urgent. Similarly, where a greater degree of risk is tolerable, it may be acceptable to delay rehabilitation of the corbels. This paper discusses how risk analysis may be used evaluate the urgency of rehabilitating the corbels in buttress-type dams.
机译:目前正在使用的大多数支撑大坝在五十岁之间设计和建造之间。毫不奇怪,这些较旧的设计往往不符合钢筋混凝土部分设计的现今要求。这常用的是支撑支撑坝中的板条或拱门的壳牌。支撑坝的Corbels通常没有用足够的加强钢构造,以满足现代钢筋混凝土码的延展性要求。促进的钢筋突然(脆弱),不可预测的方式可能失败。如果柯克尔失败,它可能导致对上游板坯或拱门的支持,这将导致违约大坝。因此,涉及CORBEL的故障模式可能对大坝的整体安全产生重大影响。结果,可能需要昂贵和潜在的破坏性康复,以提供必要的安全程度。大坝工程实践的状态正在朝着基于风险的评估结构的方法。该技术比较了对失败后果失败的风险。在存在风险相对较低的耐受性的情况下,来自CORBEL的风险的贡献可能是不可接受的,并且坝体操作或核心的恢复可能被认为是紧迫的。类似地,在更大程度的风险可忍受的情况下,可以延迟康复的恢复。本文讨论了可能使用风险分析的危险性分析评估支撑型水坝中的核心的紧迫性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号