RISK ASSESSMENT OF CORBELS IN BUTTRESS DAMS

机译:牛角扣的风险评估

获取原文
获取原文并翻译 | 示例

摘要

Most of the buttress dams currently in service today were designed and constructedrnbetween fifty and one hundred years ago. Not surprisingly, these older designs often do notrnmeet present day requirements for the design of reinforced concrete sections. This is often therncase with the corbels that support the slabs or arches in buttress dams. The corbels forrnbuttress dams were typically not constructed with sufficient reinforcing steel to meet thernductility requirements of modern reinforced concrete codes.rnUnder-reinforced corbels can fail in a sudden (brittle), unpredictable manner. If arncorbel were to fail, it could result in loss of support for the upstream slab or arch, which wouldrnresult in a breach of the dam. Therefore, a failure mode involving a corbel can have arnsignificant impact on the overall safety of the dam. As a result, costly and potentially disruptivernrehabilitation may be needed to provide the necessary degree of safety.rnThe state of the practice in dam engineering is moving towards a risk-based approachrnto evaluating structures. This technique compares the risk of failure against the consequencesrnof failure. Where a relatively low tolerance for risk exists, the contribution of risk from therncorbels may be unacceptable, and changes in dam operation or rehabilitation of the corbelsrnmay be considered urgent. Similarly, where a greater degree of risk is tolerable, it may bernacceptable to delay rehabilitation of the corbels. This paper discusses how risk analysis mayrnbe used evaluate the urgency of rehabilitating the corbels in buttress-type dams.
机译:今天使用的大多数支撑坝都是在五十到一百年前设计和建造的。毫不奇怪,这些较旧的设计通常不能满足当今对钢筋混凝土截面设计的要求。通常用支撑支柱水坝中的平板或拱形的牛腿来解决。牛腿式要塞大坝通常不使用足够的钢筋建造,无法满足现代钢筋混凝土规范的导热性要求。牛腿式加固可能会突然(脆性),无法预测的方式发生故障。如果arncorbel失败,则可能会导致对上游平板或拱的支撑丧失,从而导致大坝破坏。因此,涉及牛腿的失效模式可能对大坝的整体安全产生重大影响。结果,可能需要昂贵且潜在的破坏性修复来提供必要的安全性。大坝工程实践的现状正在朝着基于风险的方法评估结构。该技术将失败的风险与后果的失败进行了比较。如果存在相对较低的风险承受能力,则可能无法接受风险因素的贡献,并且可能会认为大坝运行发生变化或调整风险因素是紧迫的。同样,在可以忍受更高风险的情况下,延迟牛腿的康复可能是不可接受的。本文讨论了如何使用风险分析来评估支撑式大坝上的牛腿的迫切性。

著录项

  • 来源
    《Dam safety 2009》|2009年|p.1-8|共8页
  • 会议地点 Hollywood FL(US);Hollywood FL(US)
  • 作者单位

    URS Corporation, Denver, CO;

    rnURS Corporation, Denver, CO;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TV698.23;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号