首页> 外文会议>International Forum on Information Technology and Applications >Study on Integration and Management System of Schedule in Large Complex Construction Engineering Projects Based on Lean Construction
【24h】

Study on Integration and Management System of Schedule in Large Complex Construction Engineering Projects Based on Lean Construction

机译:基于精益建设的大型复杂建筑工程项目安排融合与管理体系研究

获取原文

摘要

There were many phases, hiberarchies, activities and partners in the schedule of construction engineering projects, especially the large-scale construction engineering projects, and the activities were complicated, the processes were very difficult, which has high impact on information communication between each partners, accordingly, the schedule would be out of controlling, the cost would be increased, and even the quality would be not satisfied with the owner. On the basical theory of Lean Construction and multistage plans of construction engineering project, Integration and Management System of Schedule in Large Complex Construction Engineering Projects (IMSSLCCEP) was proposed. It was studied from the data flow,hiberarchy and functional model. Finally,the cases of applying of IMSSLCCEP were studied, which educed that IMSSLCCEP was an effective way for large complex construction engineering schedule management from whole angle.
机译:建筑工程项目的时间表中有许多阶段,层次,活动和合作伙伴,特别是大规模建筑工程项目,活动复杂,流程非常困难,对每个合作伙伴之间的信息沟通影响很高,因此,该时间表将失控,成本将增加,甚至质量也不会对所有者满意。关于精益建设基本理论,建设工程项目的多级计划,提出了大型复杂建筑工程项目中的融合与管理体系(IMSSLCCEP)。从数据流,层次结构和功能模型中研究了它。最后,研究了IMSSLCCEP的应用案例,该案件引发了IMSSLCCEP是从整个角度的大型复杂建筑工程进度管理的有效途径。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号