Scheduling with sequence dependent setup times in application to Magnetic Resonance Imaging scans processing

机译:在应用于磁共振成像扫描处理中的序列相关设置时间

获取原文

摘要

We describe an algorithm for solving a single machine scheduling problem with additional assumptions motivated by Magnetic Resonance Imaging (MRI) Systems. In the operating model, the setup times are sequence dependent and the objective is to minimize the total production time. An application of the algorithm to the real MRI examination results in an increase of the scanner workflow.
机译:我们描述了一种求解单机调度问题的算法,其具有由磁共振成像(MRI)系统的额外假设。在操作模型中,设置时间是依赖的序列,目标是最小化总生产时间。算法在真实MRI检查中的应用导致扫描仪工作流程的增加。