Enhancing Environmental Performance Through Common Process From 20 EMS's To One

机译:通过20个EMS到一个人通过共同过程提高环境绩效

获取原文

摘要

BP Group requires all major operating sites to be verified to the ISO14001 international standard. In 2001 BP Exploration and Production North Sea operations had 20 sites with individual Environmental Management Systems (EMSs) certified by different verifiers with different approaches. There was little consistency or knowledge sharing. Following a series of reorganisations and rationalisation, by 2003 there were seven verified EMSs across the UK, Norway and Netherlands. Restructuring of assets rendered this arrangement unsustainable therefore in 2005 the project to consolidate the assets’ EMSs began in earnest. The BP organisation philosophy is for the business to utilise common processes. This project evaluated the EMS structures within the UK, Norway and Netherlands with the objective to identify and implement the most effective way to deliver consistency and further continuous environmental improvement. The project followed a BP internal project process, engaged key individuals, including Norway and the Ne therlands and sought input from BP Group, regulators and other operators. The decision was taken to move to country specific EMSs as this was the simplest option to implement and maintain, given language, legislation and contractor capability. The implementation began on completion of a management of change exercise. At this point the major focus of the project was to transform the existing EMSs operating in the UK into one and find a suitable verifier: The requirement was that they should have existing organisational capability for the range and location of BP UK assets with personnel qualified for both onshore and offshore activities and be experienced in using a risk based approach. Several companies tendered and following evaluation a verifier was selected for their alternative approach. At the same time work was ongoing to simplify and rationalise the EMS documentation and improve its accessibility, resulting in a high level framework with limited site specific requirements. Following a period of intensive internal and external auditing the UK North Sea EMS was certified to ISO14001 in November 2006.
机译:BP集团要求所有主要的操作网站验证到ISO14001国际标准。 2001年,BP勘探和生产北海业务有20个网站,其中包括不同验证的各种环境管理系统(EMSS),不同的验证者具有不同的方法。几乎没有一致或知识共享。在一系列重组和合理化之后,到2003年,英国,挪威和荷兰共有七个验证的EMS。资产的重组使这一安排是不可持续的,因此在2005年巩固资产EMS的项目开始认真。 BP组织哲学是为了企业利用共同流程。该项目评估了英国,挪威和荷兰内部的EMS结构,目的是识别和实施提供一致性和进一步持续的环境改善的最有效方法。该项目遵循BP内部项目流程,聘请关键人体,包括挪威和田地,并寻求BP集团,监管机构和其他运营商的投入。该决定被采取迁移到国家特定的EMS,因为这是实施和维护,鉴于语言,立法和承包商能力的最简单选择。实施开始完成改变运动的管理。此时该项目的主要焦点是将现有的EMS转换为一个,并找到一个合适的验证者:要求是他们应该为合格的人员提供现有的组织能力,以及BP英国资产的范围和地点陆上和海上活动都是在使用基于风险的方法的情况下进行体验。为其替代方法选择了招标和遵循评估后的几家公司。同时工作正在进行中,简化和合理化EMS文档并提高其可访问性,从而导致具有限制特定要求的高级框架。在一段时间内的内部和外部审计期间,英国北海EMS于2006年11月被认证至ISO14001。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号