首页> 外文会议>International Symposium on Environmental Concerns in Rights-of-Way Management >The Implementation of Vegetation Management Projects on U.S. Forest Service Lands: The Big Eddy-Ostrander Vegetation Project on the Mt. Hood National Forest
【24h】

The Implementation of Vegetation Management Projects on U.S. Forest Service Lands: The Big Eddy-Ostrander Vegetation Project on the Mt. Hood National Forest

机译:美国森林服务土地植被管理项目的实施:山区山区大伊迪鸵鸟植被项目

获取原文

摘要

Utility forestry has become a primary maintenance issue for the Bonneville Power Administration(BPA) since the August 10th, 1996, western United States outage. This issue has been sustained bythe massive power outage caused by tree outages last summer (2003) in the northeastern UnitedStates. One of the responses to the 1996 event by the Bonneville Power Administration was todevelop a programmatic Environmental Impact Statement (EIS) for the transmission system. Thegoal of the EIS was to develop a strategy and provide a clear path for managers to implementenvironmental analysis when developing powerline vegetation management programs on BPArights-of-way that cross in the Pacific Northwest. The Big Eddy-Ostrander project initiated onU.S. Forest Service lands, proposed the use of herbicides using the EIS as the analysis guide. Asa cooperative project with the Oregon Department of Agriculture and the U.S. Forest Service tocontrol noxious weeds, many items needed to be worked out. These items included: the determi-nation of who was the lead agency for the project, what formats should be used for environmentaldocuments, who could appeal the process, and what did each agency want to see during the en-vironmental analysis process. The end result of the process was that in the summer of 2003, BPAmade the first herbicide treatment for vegetation management on the right-of way located in theZig Zag Ranger District in over 20 years.
机译:自1996年8月10日以来,森林林业已成为Bonneville Power Administration(BPA)的主要维护问题。这一问题是由去年夏天(2003年)在美国东北部(2003年)引起的大规模停电。 Bonneville Power Admplation对1996年事件的答复之一是为传输系统开发一个方案环境影响声明(EIS)。 EIS的技术是制定战略,并为管理人员提供明确的道路,以便在开发电力线植被管理方案时对在太平洋西北地区的跨越方式开发电力线植被管理计划时。 Big eddy-extrander项目启动了Onu.s.森林服务土地,提出使用EIS作为分析指南使用除草剂。 ASA合作项目与俄勒冈州农业部和美国森林服务往来控制有害杂草,许多物品需要锻炼。这些物品包括:世卫组织的确定是该项目的牵头机构,可以用于对环境中吸引流程的环境的格式,以及每个机构希望在通风环境分析过程中看到什么。该过程的最终结果是,2003年夏天,BPAMADE在20年多的Zag Ranger区位于Thezig Zag Ranger区的植被管理的第一次除草剂处理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号