When Public Convenience and Necessity Are Not Enough: Who Is Deciding Whether, Where, and How to Build Natural Gas Pipelines?

机译:当公共便利和必要性还不够:谁决定是否,在哪里以及如何建造天然气管道?

获取原文

摘要

Receiving Federal Energy Regulatory Commission or state utility commission authorizations thatconvey the power of eminent domain has historically provided utility companies in the UnitedStates with some assurance that natural gas pipelines could be built in a timely and financiallypredictable manner. Recent projects have called this concept into question. In implementingtheir environmental regulations, other federal and state agencies, possessing limited authorityover natural gas pipelines, have delayed projects that have already been determined to be inthe public interest and received certificates of public convenience and necessity. As a result ofconflicting or overlapping agency objectives and priorities, project applicants have experiencedlengthy reanalysis of a project's purpose and need, routing alternatives, and environmental im-pacts. Resulting delays and environmental permit conditions have significantly increased costs,jeopardized delivery contracts, and in some cases, resulted in project cancellation. Case studiesof the Islander East, We Energies, and Georgia Strait Crossing pipeline projects provide specificdetails on the economic and regulatory impacts resulting from this phenomenon. The implica-tions of conflicting environmental regulatory review and insufficient agency coordination, andthe steps being taken to avoid scenarios such as those presented in the case studies are also dis-cussed.
机译:接受联邦能源管理委员会或州公用事业委员会授权thatconvey征用的权力在历史上提供了公用事业公司的UnitedStates的一些保证天然气管道可以建立及时,financiallypredictable方式。最近的项目叫这个概念提出了质疑。在implementingtheir环保法规,其他联邦和州政府机构,具有有限authorityover天然气管道,推迟已经被确定为了社会的利益,方便市民和必要性获颁证书的项目。结果ofconflicting或重叠的机构目标和工作重点,项目申请者的项目的目的和需要experiencedlengthy再分析,路由选择,和环境IM-协定。造成延误和环境许可证条件显著增加的成本,损害供货合同,并在某些情况下,导致项目取消。案例岛民东studiesof,我们能源和乔治亚海峡隧道管道项目提供从这种现象造成的经济和监管的影响特定细节。 ,正在采取相互矛盾的环境监管审查和机构间协调不足的implica,并且所述系统蒸发散步骤,以避免情景如在案例研究中提出的,也DIS-倔强。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号