首页> 外文会议>International Symposium on Environmental Concerns in Rights-of-Way Management >Pipeline Construction and Compliance with the Migratory Bird Convention Act
【24h】

Pipeline Construction and Compliance with the Migratory Bird Convention Act

机译:管道建​​设和遵守“迁徙鸟类公约”法案

获取原文

摘要

The Migratory Bird Convention Act (MBCA) and Regulations were enacted to implement inCanada the Migratory Bird Convention of 1916. The purpose of the Act and its enabling Regula-tion is to protect migratory birds and nests. Pertinent sections of the legislation prohibit: "... thekilling, injure or harassment of a migratory bird; the disturbance, destruction or take of a nest, egg,or nest shelter of a migratory bird ..." There are no provisions within the MBCA or Regulationsto allow for the incidental take of migratory birds in relation to projects undertaken within birdhabitat. Generally, pipeline construction activities are planned to occur in accepted "windows"to avoid potential impacts to other natural resources or land use activities. Breeding and nestingactivity generally occurs between April and August. These dates are regionally influenced andactivity can start much earlier and extend later into the summer season. Given the long periodfor breeding and nesting activity, the available period to carry-out pipeline construction is being"squeezed" in between the end of the migratory bird breeding/nesting activity and the begin-ning of fall timing windows for fisheries and agricultural resources. The scope of most pipelineactivities does not fit within this available time. This paper outlines how Maritimes & NortheastPipeline LLP developed and implemented a program for managing compliance with the MBCAand Regulations during construction of the Saint John Lateral, in New Brunswick, Canada.
机译:“迁徙鸟类公约法”(MBCA)和法规颁布了1916年的迁徙鸟类公约。该法案及其启动规则的目的是保护迁徙鸟类和巢穴。立法的相关部分禁止:“...... TheKilling,伤害或骚扰候鸟;巢鸟的骚扰,破坏或巢穴庇护......”没有任何规定MBCA或法规允许偶然接受迁徙鸟类与Birdhabitat内部开展的项目相关的接种。通常,计划在接受的“Windows”中进行管道施工活动,以避免对其他自然资源或土地使用活动的潜在影响。繁殖和筑巢率通常发生在4月和8月之间。这些日期是区域影响的Antactivity可以在早期开始,后来延伸到夏季。鉴于繁殖和筑巢活动的长期,在迁移鸟类繁殖/筑巢活动结束和渔业和农业资源的秋季时序窗口开始之间,将进出管道建设的可用期间正在“挤压”。大多数管道反应性的范围不适合在此可用时间内。本文概述了Maritimes&Northealtpipine LLP如何制定并实施管理加拿大新不伦瑞克的圣约翰横向建设期间遵守MBCAAND规定的计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号