首页> 外文会议>Power Plant Air pollutant Control "MEGA" Symposium >Important Considerations for Permitting of Emission Control Systems - Lessons Learned and Recommendations
【24h】

Important Considerations for Permitting of Emission Control Systems - Lessons Learned and Recommendations

机译:允许排放控制系统的重要考虑因素 - 培养的经验教训和建议

获取原文

摘要

The U.S. Environmental Protection Agency (EPA) has recently proposed and promulgated many new air quality regulations that affect electric generating units (EGUs). Air pollution control (APC) systems have already been installed on many EGUs nationally to meet federal and state regulations, such as the Maryland Healthy Air Act - the State's multi-pollutant regulation targeting coal-fired EGUs; APC systems will be installed on other EGUs in the near future. Operational issues associated with retrofitting existing units with new APC systems could affect compliance with emission standards. Even for new generating units, including gas turbines, there are important operational considerations, especially regarding emissions during startup and shutdown, that not only influence how air permits are structured, but how compliance strategies are developed. This paper examines the operational issues associated with APC systems and the impacts these issues have on developing air permits, especially for limits during periods of startup and shutdown, and developing approaches for compliance.
机译:美国环境保护局(EPA)最近提出并颁布了许多影响电力发电机单元(eGU)的新空气质量法规。空气污染管制(APC)系统已经安装在许多吉士国内,以满足联邦和州法规,如马里兰州健康的空国法案 - 国家的多污染物调节靶向燃煤皇族; APC系统将在不久的将来安装在其他EGU上。与新的APC系统改装现有单元相关的操作问题可能会影响遵守排放标准。即使对于包括燃气轮机,包括燃气轮机的新发电机,也存在重要的操作考虑因素,特别是在启动和关机期间的排放,这不仅会影响空气允许的结构,而且如何开发合规策略。本文介绍了与APC系统相关的运营问题,并影响这些问题对开发空气允许的影响,特别是在启动和关机期间的限制,以及开发合规方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号