Geosynthetics used in waste containment facilities have occasionally encountered problems due to substandard geosynthetics, construction methodology, inadequate or inappropriate design, and poor operating practices.These problems are normally detected during construction or operational stages and the associated costs to correct them are many times higher than the original construction amount. This situation sometimes results in impacts to public health, loss of reputation and litigation. Fundamentally, through proper design, well planned material quality assurance (MQA) and construction quality assurance (CQA) most of the problems can be eliminated and consequently reduce or practically avoid the possibilities of damage to the natural environment and public health and safety. Vital collaborative participation of the key players in the industry: designer, MQA/CQA, and independent testing laboratories are important to a successful outcome. These coupled with administration and implementation of governmental statutes affecting the activities in all phases of waste containment projects will ensure attainment of the previously cited goals.
机译:废物遏制设施中使用的土工合成剂偶尔会遇到问题,因为不合标准的地质合成,施工方法,不足或不适当的设计,以及差的操作措施。在施工或运营阶段通常检测到纠正它们的相关成本比原始施工金额。这种情况有时会导致对公共卫生,声誉丧失和诉讼的影响。从根本上,通过适当的设计,规划的材料质量保证(MQA)和施工质量保证(CQA)的大部分问题都可以消除,从而减少或实际避免对自然环境和公共卫生和安全损害的可能性。业内主要参与者的重要协作参与:设计师,MQA / CQA和独立的测试实验室对成功的结果很重要。这些加上政府法规的管理和实施影响废物遏制项目所有阶段的活动,将确保获得以前引用的目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号