首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >Successful Strategy for Waterflooding Project Implementation in an ExtraHeavy Oil Field
【24h】

Successful Strategy for Waterflooding Project Implementation in an ExtraHeavy Oil Field

机译:紫外线油田中的水土植物项目实施成功战略

获取原文

摘要

Chichimene is the third most important field of Colombia,with an original oil in place of USD 3.1 millionbarrels,producing an extra heavy oil of around 8 API,characterized by high viscosity and reduced mobility.The estimated recovery factor was around 3%,and the reservoir pressure was declining drastically; becauseof this,it was necessary to urgently implement an enhanced oil recovery project,since without immediateintervention,the reservoir and field production would be seriously affected.A thorough screening process was performed among diverse EOR options,and waterflooding wasselected as the best alternative for maintaining reservoir pressure and increasing the recovery factor.Themain challenge was to have a rapid implementation for the entire reservoir,considering that this regionhas reported community issues derived mainly from water management disagreements and inconformitywith stringent labor requirements.Additionally,lengthy environmental permits and high deploymentexpenditures were factors that affected field development plans.The research of an effective technology for the field-specific conditions and a low deployment costindicated dumpflood as the best alternative,since it enabled injection from a deeper water formation to anupper production target zone through a smart BHA,substantially reducing injection facilities investmentand operational costs.Time savings were identified,eliminating additional requirements for environmentalpermits.The main concern was that this technology has never been implemented for extra heavy oils.Simulations in a steady state simulator validated the feasibility of the dumpflood technique in thefield.Models of the production and injection zones evidenced the pressure needs and the necessary BHAadjustments to meet the target rates and to define the completion model with the specific equipment toperform the operation.Implementation started in the South West area of the field and was deployed with three waterfloodingpatterns in a record time of three months.After nine months of operation,the reservoir pressure augmentedin the surrounding wells,and the failure indicator of the electrical submersible pumps was reduced by afactor of 20%.As a major milestone,the average field production climbed by approximately 10,000 bbl/d.Considering the successful results,the project was extended to 20 waterflooding patterns in other areas of the field,the waterflooding project was approved and sanctioned one year after the pilot startup andtherefore over 20,000 barrels of oil equivalent were incorporated to the proved reserve balance.
机译:Chichimene是哥伦比亚最重要的领域,原油代替3.1百万美元,生产大约8 API的重质油,其特征在于高粘度和减少的流动性。估计的恢复因子约为3%,估计恢复因子约为3%,而且水库压力急剧下降;因此,有必要迫切地实施增强的石油回收项目,因为没有立即实施,水库和现场产量将受到严重影响。在不同的EOR选项中进行彻底的筛查过程,并将Wasselect作为维护水库的最佳选择。压力和提高恢复因素。考虑到这一地区报告的社区问题主要来自水资源管理分歧和不合格的劳动要求,这一地区挑战是迅速实施。受影响的现场开发计划。对现场特定条件的有效技术以及低部署昂贵倾卸垃圾的研究作为最佳替代品,因为它通过智能BHA,潜艇从更深的水形成到Anupper生产目标区域的注射繁衍减少注射设施投资商的运营成本。确定了节省的时间,消除了对环境的额外要求。主要关切的是,这项技术从未用于超重油。稳态模拟器中的应用验证了垃圾场技术在菲尔德的可行性。生产和注射区域的微小,证明了压力需求和必要的BHAAdjustments,以满足目标速率,并定义与特定设备的完工模型拓展操作。在该领域的南部地区开始实现,并用三个开始在历史记录时间为三个月的水壶。在九个月的运行中,储层压力增压在周围的孔中,电气潜水泵的失效指示器减少了20%的主要里程碑,平均现场生产攀升大约10,000 bbl / d。参考e成功的结果,该项目延长到20个地区的20个水上飞机模式,在飞行员启动后一年内批准并批准了20,000桶石油当量纳入证明储备余额。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号