首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >Well Production Performance in a Deviated ICD Completion: Case Study with Analogous Cased and Perforated Wells. Villano Field-Ecuador
【24h】

Well Production Performance in a Deviated ICD Completion: Case Study with Analogous Cased and Perforated Wells. Villano Field-Ecuador

机译:偏离ICD完成中的生产性能:案例研究,具有类似套管和穿孔井。 Villano Field-厄瓜多尔

获取原文

摘要

This paper aims to show the behavior of a 66° deviated well completed with Inflow Control Devices (ICD) after 5 years of production, making a comparison with two analogous wells that have a standard Casing and Perforated completion (C&P). At that time, this type of installation (2011) was the first case in Latin-America. The study is complemented with the performance of two ICD installed in parallel with two horizontal wells. The analysis describes the ICDs completion for a deviated well, the reasons why the well was completed in this manner and the production results obtained for three wells (1 ICD and 2 C&P) using elapsed time comparisons. The analysis considered the historical Water Cut (WC), the Productivity Index (PI), and Fluid Performance (Oil and Water). Furthermore the use of diagnostic plots to identify the water production mechanism taking into accounts the main facility (water treatment) constraints during the production of the wells. The deviated ICD completion allowed a Water Cut reduction of at least 10% after 5 years of production, delaying the premature water channeling with an positive reserve impact compared with analogous C&P wells. Moreover this type of completion provides a new way to complete deviated wells, with more than a 45° angle, where the quality of the initial cementation job is doubtful.
机译:本文旨在显示66°的行为,在生产5年后,使用流入控制装置(ICD)偏离良好的工作,与具有标准壳体和穿孔完成(C&P)的两个类似孔进行比较。此时,这种类型的安装(2011)是拉丁美洲的第一个案例。该研究与两台水平井并联安装的两个ICD的性能补充。分析描述了偏离井的ICDS完成,原因是井以这种方式完成的原因以及使用经过时间比较的三个孔(1 ICD和2 C&P)获得的生产结果。该分析考虑了历史水切割(WC),生产力指数(PI)和流体性能(油水)。此外,使用诊断局部识别水生产机制,以核对生产井的主要设施(水处理)限制。偏离的ICD完成允许在生产5年后减少至少10%,与类似C&P孔相比,延迟过早的水沟。此外,这种类型的完成提供了一种新的方式来完成偏离井,超过45°角,最初的胶泥工作质量是值得怀疑的。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号