...
首页> 外文期刊>World Oil >Completion design analysis: A case study for water control in Villano field,Ecuador
【24h】

Completion design analysis: A case study for water control in Villano field,Ecuador

机译:完成设计分析:厄瓜多尔维拉诺田水控案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Agip Oil Ecuador(AOE)operates Villano field,in a tropical rainforest in Pastaza Province of Ecuador.The field was discovered in 1950 by Shell Global.Production began in May 1999.Since 2000,the field has been operated 100% by AOE.The development was completed in six phases,which included the construction of facilities,flowlines and well pads,and the drilling of production and water disposal wells(WDW).The field produces approximately 12,900 bopd and 204,000 bwpd,which is 100% re-injected.The water disposal is in the Hollin formation,below the oil-water contact.The producing wells are horizontal with 1,500 to 2,500 ft of open-hole length.However,oil production is constrained by the maximum fluid handling capacity.
机译:Agip Oil厄瓜多尔(AOE)经营Villano Field,在厄瓜多尔的Pastaza Province的热带雨林中。该领域于1950年被壳牌全球发现。生产于1999年5月。2000年5月,该领域由AoE 100%运行。 开发完成于六个阶段,其中包括建造设施,流动线和垫垫,以及生产和水处理井的钻井(WDW)。该领域产生约12,900名BoPD和204,000 BWPD,这是100%重新注射的。 水处理处于荷敏形成,低于油水触点。生产井水平,露天孔长度为1,500至2,500英尺。然而,石油产量受到最大流体处理能力的约束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号