...
首页> 外文期刊>Journal of Petroleum Technology >Cased-hole completions without perforating eliminate risks
【24h】

Cased-hole completions without perforating eliminate risks

机译:不打孔的套管完井消除了风险

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Perforating is a double-edged sword for well completions in uncon-solidated formations.Perforations open conduits for hydrocarbon flow from the formation to the wellbore.But the perforating process can cause damage to the formation and result in excessive debris,posing operational risk and impairment to well productivity.As a result of a joint industry project (JIP) formed in 2002,a new technology has been developed and field tested that installs a liner and sand control completion in a single trip while eliminating explosive perforation charges and associated risks.
机译:射孔是在未固结地层中完井的双刃剑,射孔打开了从地层到井眼的碳氢化合物流的导管,但是射孔过程会损坏地层并导致过多的碎屑,从而带来操作风险和损害作为2002年成立的联合工业项目(JIP)的结果,已经开发了一项新技术并进行了现场测试,该技术可在一次行程中安装衬管和防砂完井技术,同时消除了爆炸性射孔费用和相关风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号