首页> 外文会议>Society of Petroleum Engineers Digital Energy Conference and Exhibition >Transforming Operations with Real Time Production Optimization and Reservoir Management: Case History Offshore Angola
【24h】

Transforming Operations with Real Time Production Optimization and Reservoir Management: Case History Offshore Angola

机译:用实时生产优化和水库管理转换运营:案例历史离岸安哥拉

获取原文

摘要

The subject field is located 50 miles offshore Angola in ~1200’ of water. The compliant piled tower that supports this development in Block 14 is one of the largest manmade structures in the world. The 46-well development plan includes both wet and dry trees. The multi-layered reservoirs are heterogeneous in nature. To extract the most value from this development, Chevron has developed and deployed an integrated solution that uses people, processes and technology to improve performance. In 2002 Chevron began exploring how integrated digital solutions could help better manage the reservoirs, wells and facilities. Since that time, a fully fledged i-field? program was developed with a vision for transforming operations through technology. It’s about making sure the right people have the right information at the desired frequency in a usable format at the right time to make the best decision. It’s about teamwork and collaboration across function and distance. It’s about providing people the time and space to develop creative alternatives and solutions to effectively manage the daily and longer term challenges. The Production Optimization Solution for the subject field was successfully deployed in September 2010. The solution is designed to improve production engineering productivity, increase production and recovery by optimizing overall field management, and decrease response time through early problem detection. Two initial engineering workflows were deployed along with an asset overview dashboard that displays key information, trends and results. After a rigorous evaluation process, a project team was created to develop the engineering workflows that make use of nodal analysis and pressure transient analysis tools for field and model management. A 3rd party vendor was selected to design and manage the data and application integration required to successfully implement the solution. This paper will detail the development and deployment of this integrated solution that is allowing the engineers to spend more time on technical work, respond quicker to anomalies, and make better, faster decisions. It will also discuss the requirements for success that include change management, training, support and organizational capability.
机译:主题领域位于〜1200'水中的离岸安哥拉50英里。支持在第14座在框14中支持这一发展的符合符合塔之一是世界上最大的人造结构之一。 46井开发计划包括湿树和干树。多层储存器本质上是异质的。要从此开发中提取最大的价值,雪佛龙已开发并部署了一种集成解决方案,该解决方案使用人员,流程和技术来提高性能。 2002年,雪佛龙开始探索集成的数字解决方案如何有助于更好地管理水库,井和设施。自那个时间以来,一个完全成熟的I-yield?计划是通过技术转换操作的愿景开发的。这是为了确保合适的人以适当的时间以可用格式在所需的频率下具有正确的信息来做出最佳决定。这是关于跨功能和距离的团队合作和协作。它是关于为人们提供制定创意替代品和解决方案的时间和空间,以有效地管理日常和长期挑战。主题领域的生产优化解决方案于2010年9月成功部署。该解决方案旨在通过优化整体现场管理,通过早期问题检测降低响应时间来提高生产工程生产力,提高生产和恢复。两个初始工程工作流程量随着资产概述仪表板部署,显示关键信息,趋势和结果。经过严谨的评估过程后,创建了一个项目团队,以开发工程工作流程,这些工程流量为现场和模型管理使用节点分析和压力瞬态分析工具。选择了第三方供应商来设计和管理成功实现解决方案所需的数据和应用程序集成。本文将详细介绍这种综合解决方案的开发和部署,允许工程师花更多时间在技术工作中,更快地响应异常,并做出更好,更快的决策。它还将讨论成功的要求,包括变更管理,培训,支持和组织能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号