首页> 外文会议>SPE Annual Technical Conference and Exhibition >Revised Big Bore Well Design Recovers Original Bayu-Undan Production Targets
【24h】

Revised Big Bore Well Design Recovers Original Bayu-Undan Production Targets

机译:修改了大孔井设计恢复了原始的Bayu-Undan生产目标

获取原文

摘要

The Bayu-Undan gas recycling project is located north of Australia, in the East Timor Sea and is designed to produce 1,100 MMscf/D of wet gas, strip out 110,000 B/D of condensate/LPG, initially reinject 950 MMscf/D of lean gas, and later export up to 700 MMscf/D of lean gas to a LNG plant in Darwin. The initial development called for 16 North Sea-style, 7 in. monobore wells (11 producers and 5 gas injectors).
机译:Bayu-Undan Gas Recycling项目位于澳大利亚北部,位于东帝汶海岸,设计用于生产1,100 mmscf / d湿气,剥离110,000 b / d的冷凝水/液晶,最初重新加注950 mmscf / d瘦天然气,后来出口高达700 mmscf / d达尔文的液化天然气。初步开发呼吁16北海式,7英寸。蒙多多井(11家生产商和5个气体注射器)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号