BFLP GASOLINE FRACTIONATOR STONE WEBSTER RIPPLE TRAYTM INSTALLATION

机译:BFLP汽油分馏石和韦伯斯特纹波托架安装

获取原文

摘要

In the fourth Quarter of 2001, BASF and Total started up one of the world's largest naphtha based olefins facilities in Port Arthur, Texas. After the unit start up, the pressure drop of the Gasoline Fractionator's packed sections started to increase and the tower's performance started to degrade. Eventually after 1.5 years of operation, the two packed bed sections of the 35ft diameter tower were damaged. The tower remained in operation with reduced separation capability, while a project was initiated to replace the packed bed sections with Stone & Webster Ripple Trays~(TM). To minimize downtime during the scheduled outage in the second quarter of 2006, the top half of the GasFrac with the damaged packed beds was cut off and replaced with a new top section with the Ripple Trays~(TM) already installed, using a Modular Lifting Tower technique. This paper will discuss the original tower design, the damage to the internals, the new Ripple Tray~(TM) design, the construction of the new shell section, the Modular Lifting Tower technique, the execution of the top section replacement, and the performance of the tower after the 2006 outage. The construction of the new shell section just outside the plant and the installation of the Ripple Trays~(TM) will be documented. The transport of the new section to site, the Modular Lifting Technique, used to lift the new section over a pipe rack and to replace the old section, and the outage schedule challenges will be illustrated. Finally, the performance of the Gasoline Fractionator with the Ripple Trays~(TM) after the outage will be reviewed.
机译:在2001年第四季度,巴斯夫和全球总部启动了世界上最大的德克萨斯港港口的基于石脑油的烯烃设施之一。单位启动后,汽油分馏器的填充部分的压降开始增加,塔的性能开始降低。最终经过1.5年的运行后,35英尺直径塔的两个包装床段受损。该塔仍然在运行中,分离能力降低,同时启动了一个项目,以用石头和韦伯斯特纹波托盘替换填充床段〜(TM)。为了在2006年第二季度预定停机期间停机时间最大限度地减少停机时间,将损坏的填料床的最高一半被切断并用一个已经安装的纹波托盘〜(TM)用新的顶部替换,使用模块化提升塔技术。本文将讨论原塔设计,内部损坏,新的纹波托盘〜(TM)设计,建设新的壳牌段,模块化升降塔技术,执行顶部更换,以及性能2006年停电后的塔。将记录厂房外的新壳体部分和安装波纹托盘〜(TM)的建造。新部分的运输到现场,模块化提升技术,用于将新部分抬起在管道架上并取代旧部分,并将说明中断日程挑战。最后,将审查停电后与纹波托盘〜(TM)的汽油分馏器的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号