【24h】

A STUDY ON FIELD TEST METHOD OF LONG-SPAN CONCRETE BRIDGE

机译:长跨度混凝土桥田试验方法研究

获取原文
获取外文期刊封面目录资料

摘要

Traditional field testing of a bridge is usually done only according to an equivalence principle of a single internal action like bending moment in the middle-span section, which ignores 3-D loading effects and the comprehensive influence of the bending moment, the shearing force and the twist moment. This paper builds the computation model of a completed bridge by finite element software ANSYS to analyze the most unfavorable loading effect comprehensively produced by the bending moment, the shearing force and the twist moment under the design load. The method of the comprehensive equivalent loading is introduced. The field test proved that the method proposed in the paper could evaluate the actual bearing capacity of a bridge structure more effectively.
机译:桥梁的传统场地测试通常仅根据单个内部动作的等效原理来完成,如中间跨度部分的弯曲时刻,它忽略了3-D负载效果和弯矩,剪切力和剪切力的综合影响扭曲时刻。本文通过有限元软件ANSYS构建完整的桥梁的计算模型,分析了由弯矩,剪切力和设计负荷下的扭曲力矩全面产生的最不利的装载效果。介绍了综合等效载荷的方法。现场测试证明了本文提出的方法可以更有效地评估桥梁结构的实际承载力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号