首页> 外文会议>Environmental Conference >PORT HAWKESBURY BIOREMEDIATION SECONDARY CONTAINMENT UPGRADES
【24h】

PORT HAWKESBURY BIOREMEDIATION SECONDARY CONTAINMENT UPGRADES

机译:港口霍克斯伯里生物修复与次要遏制升级

获取原文

摘要

Between the years 2003 and 2006 Earth Tech designed and oversaw the implementation of two separate Remedial Action Plans (RAP) at Statia Terminal’s active oil terminal at Point Tupper, Nova Scotia. Remedial actions included the excavation, characterization and biological treatment of approximately 60,000 tons of hydrocarbon (TPH)-impacted soil; the design, construction, and operation of an interception system for the removal of free product in groundwater; the characterization and removal of TPH and asbestos-impacted soils; the design and development of an on-site landfill for the impacted soils; the demolition of the pump station building and foundation; and, the removal of an underground storage tank. Site activities also included the investigation around the former pump station and seven historical waste disposal areas and preparation of site closure documentation.
机译:在2003年和2006年的地球技术之间设计并监督了在斯托普斯泰特,新斯科舍省的斯特亚洲终端的主动油码头实施了两次单独的补救行动计划(RAP)。补救措施包括约60,000吨的烃(TPH)-impacted土壤的挖掘,表征和生物学处理;用于在地下水中去除游离产品的拦截系统的设计,结构和操作; TPH和石棉抗菌土壤的表征和去除;对受影响的土壤的现场垃圾填埋场的设计和开发;爆破泵站建筑和基础;并且,拆下地下储罐。现场活动还包括围绕前泵站和七个历史废物处理区域的调查,并制定现场关闭文件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号