首页> 外文会议>Dynamic Positioning Conference >Statoil Worldwide DP Requirements Implementation and Operational Experience
【24h】

Statoil Worldwide DP Requirements Implementation and Operational Experience

机译:attoil全球DP要求实施和操作经验

获取原文

摘要

The paper details the process of development of the Worldwide DP Requirements approved and released by Statoil in August 2001. The DP Requirements are contained in Statoil's corporate Working Requirements under document number WR0581. The document presented today was developed for the Statoil B&B Well Technology department and is designed to be valid to all it's drilling and well testing operations using dynamically positioned units or vessels. This paper also uses examples to show how different Oil Operators and drilling contractors are adopting some or all of the requirements in WR0581 to assist improvement within their management of DP operations. It should be noted that the Requirements are NOT simply for NW Europe, but designed for application worldwide. Special provisions for specific aspects of operating in NW Europe are contained within the document.
机译:本文于2001年8月详细了解由STATOIL批准和发布的全球DP要求的发展过程。DP要求包含在文件编号WR0581下的“attatoil的企业工作要求”中。今天呈现的文件是为驻国石油B&B井技术部门制定的,旨在使用动态定位的单位或船只对所有它的钻井和良好的测试操作有效。本文还使用示例来展示不同的石油运营商和钻井承接商如何采用WR0581中的一些或全部要求,以协助改进其DP操作的管理。应该指出的是,这些要求不仅仅对于欧洲的欧洲,而是为全球应用而设计。在欧洲欧洲行动的特定方面的特定方面的特殊规定包含在文件中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号