首页> 外文会议>Iron and Steel Technology Conference >Installation of Vaicon Slag Stopper at U. S. Steel - Great Lakes Works
【24h】

Installation of Vaicon Slag Stopper at U. S. Steel - Great Lakes Works

机译:在U. S. Steel安装Vaicon渣塞 - 大湖泊工作

获取原文

摘要

To improve efficiency and reduce conversion costs, United States Steel Corporation installed the pneumatic slag retention system from Primetals Technologies on the two 200-ton basic oxygen furnaces operated in the meltshop at Great Lakes Works. Expected benefits from this project include reduced slag carryover, improved alloy yield and increased steel quality. The Vaicon stopper went into operation in the summer of 2018. The paper describes the equipment, operational results and benefits achieved. In the last part of the paper, an outlook on a new generation of slag stopper is presented.
机译:为提高效率和降低转换成本,美国钢铁公司从梅尔特商店运营的两座200吨基本氧气炉中安装了气动渣保留系统。 该项目的预期效益包括减少矿渣携带,改善合金产量和增加的钢质。 VAICON塞子于2018年夏天进入运营。本文介绍了设备,运营结果和效益。 在本文的最后一部分中,提出了新一代渣塞的展望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号