Thickness and Width Upgrade for Nucor Steel Berkeley Division Push-Pull Pickle Line No. 2

机译:Nucor Steel Berkeley Division推拉泡菜线2的厚度和宽度升级

获取原文

摘要

The project at Nucor Berkeley to "widen the mill" has enabled Nucor to move further into the market for agricultural and industrial machinery, heavy wall pipe and tube, and automotive and truck applications. The upgrade to the pickle line was one aspect of the total project. By focusing on the goals Nucor set out at the beginning to provide increased capability while reusing as much of the existing foundations, mechanical equipment, and electrical equipment as possible for economy, SMS group has been able to supply robust fit-for-purpose equipment within the cost and schedule requirements of the project.
机译:Nucor Berkeley的项目“扩大了磨坊”,使Nucor能够进一步进入农业和工业机械,重型壁板和管和汽车和卡车应用的市场。升级到泡菜线是总项目的一个方面。通过专注于在开始时阐述的目标,在重复使用的能力增加,同时重用现有的基础,机械设备和电气设备尽可能多的经济,SMS集团已经能够在内部提供强大的适用设备项目的成本和时间表要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号