The KORI Nuclear Power Plant Unit 1, Westinghouse 2 loop PWR rated 587 MWe, had analog modules for protection and control system and PRODAC-2500 for inplant monitoring system (IPMS) based on old technologies of 1960s and 1970s. After 20 years of operation, the I&C upgrade project was driven due to growing problems of obsolescence, increased maintenance costs and overall aging of equipment. Korea Power Engineering Company (KOPEC) successfully completed a turnkey-base revamping project contracted by Korea Electric Power Corporation (KEPCO) in 1998. The scope consisted of feasibility study, basic engineering, procurement, detail engineering, licensing support, installation, startup support and total project management.
机译:Kori核电站1,Westinghouse 2 Loop PWR评分587 MWE,具有用于保护和控制系统的模拟模块和基于20世纪60年代和20世纪70年代的旧技术的插入植物监测系统(IPMS)的模拟模块。经过20年的运营,I&C升级项目由于越来越过时的出现问题,增加了维护成本和设备总体老化而导致。韩国电力工程公司(Kopec)成功完成了1998年由韩国电力公司(Kepco)签订的交钥匙基础改造项目。该范围包括可行性研究,基础工程,采购,详细工程,许可支持,安装,启动支持和项目总管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号