首页> 外文会议>International Symposium on Sediment Budgets >Bankfull and bed load effective discharge in a steep boulder-bed channel
【24h】

Bankfull and bed load effective discharge in a steep boulder-bed channel

机译:Bankfull和床载有效放电陡峭的巨石床

获取原文

摘要

In order to achieve a better understanding of the physical processes involved in incipient bed load transport and channel-forming conditions in high-gradient streams, bed load rate and flow discharge data provided by the Rio Cordon measuring station were analysed. From 1987 to 2003, 22 floods characterized by bed load transport were recorded at the measuring station. From field surveys, the bankfull discharge was estimated to be 2.3 m3 s-1, with a return period of 1.6 years (lognormal distribution). This is consistent with previous findings regarding the frequency of bankfull conditions. Based on the flow duration curve, bankfull stage is exceeded nine hours per year. The effective discharge for bed load transport, i.e. the flow transporting the greatest amount of bed load over a long period, was estimated to be 2.45-2.65 m-1 s-1, which is close to the estimated bankfull discharge. Uncertainties associated with establishing the effective discharge are identified and discussed.
机译:为了实现更好地理解初生床负载运输和高梯度流中的沟道形成条件的物理过程,分析了RIO CORCON测量站提供的床上负荷率和流量放电数据。从1987年到2003年,测量站记录了22次以床上装载运输为特征的洪水。从田间调查,银行排放量估计为2.3 M3 S-1,返回期为1.6岁(逻辑正式分配)。这与关于银行条件频率的先前发现一致。基于流量持续时间曲线,银行阶段每年超过9小时。床载荷的有效放电,即运输长期最大的床载荷的流量,估计为2.45-2.65 m-1 s-1,接近估计的银行排放。确定和讨论了与建立有效放电相关的不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号