首页> 外文会议>Pipeline Division Specialty Conference >REPAIR OF PCCP BY POST TENSIONING
【24h】

REPAIR OF PCCP BY POST TENSIONING

机译:通过张紧修复PCCP

获取原文

摘要

The Great Man Made River Authority (GMRA) is in charge to build and operate a major water supply system in Libya. This system includes pumping stations located at the well fields, conveyor pipes and reservoirs. Six phases are scheduled. To date, three phases are in service representing around 4 000 km of pipes. Most of the pipes are 4.20m internal diameter, made of prestressed concrete, prefabricated in 7,5 m long elements. In 1999, GMRA has faced some pipe bursts due to a high corrosive environment. GMRA started immediately pipe inspections and asked Freyssinet to proceed with repair of critical pipes with additional external post tensioning. The first emergency repairs have been carried out using available materials. Since this first repair, GMRA and Freyssinet have cooperated to develop a special technology which gives a long term service and makes the repair as a final solution.
机译:伟大的人制造了河流权威(GMRA)负责在利比亚建造和经营主要供水系统。该系统包括位于井场,输送管和储层的泵站。计划六个阶段。迄今为止,使用三个阶段,代表大约4 000公里的管道。大部分管道是4.20米的内径,由预应力混凝土制成,预制在7,5米长的元素中。 1999年,由于高腐蚀性环境,GRA面临一些管道爆发。 GMRA立即开始检查管道检查,并要求Freyssinet继续修复关键管道,并具有额外的外部张力张力。使用可用材料进行了第一次紧急维修。自第一次修复以来,GMRA和Freyssinet合作开发了一种特殊的技术,提供了长期服务,并使修复成为最终解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号