In order to protect their substantial investment in wastewater collection system infrastructure and to meet anticipated upcoming regulatory requirements, The Town of Milton, Massachusetts (Milton) has taken a proactive approach towards operating and maintaining the wastewater collection system by embarking on a comprehensive Town-Wide Sewer Investigation & Rehabilitation Program. This program is a phased approach to identify wastewater collection system deficiencies, evaluate rehabilitation options and follow through with design and construction on a continuous set schedule. Identifying and correcting problems will reduce inflow and infiltration (I/I) and immediately enhance the value of the system. Wastewater collection systems are constructed for the purpose of reliably transporting wastewater from each individual user to the wastewater treatment facility. A comprehensive annual investigation program ensures that the wastewater collection system properly serves this intended purpose on a perpetual basis. By following a regular program to investigate and repair the wastewater collection system, Milton will be in a better position for regulatory compliance, maintenance and management and addressing capital improvements.
展开▼