首页> 外文会议>Pipeline Division Specialty Conference >The Use of Exploratory Tunnels as a tool for Scheduling and Cost Estimation
【24h】

The Use of Exploratory Tunnels as a tool for Scheduling and Cost Estimation

机译:使用探索性隧道作为调度和成本估算的工具

获取原文

摘要

Exploratory tunnels are commonly used for examining the geotechnical and structural aspects of proposed tunnel alignments. This paper explores the utilization of exploratory tunnels as a project management tool for estimating the cost and duration of construction for the entire project. Data were collected from the Kaponig 2.75 kilometers exploratory tunnel, a part of a double-track highspeed railway development in Austria. This knowledge and experience was used to evaluate the risks associated with design details for the final tunnel enlargement (alignment and grade, support requirements and excavation methods). A deterministic model based on Monte-Carlo simulation was developed capable of predicting potential outcomes of the total project in terms of cost and duration and their associated probabilities.
机译:探索性隧道通常用于检查所提出的隧道对准的岩土和结构方面。本文探讨了探索性隧道作为项目管理工具的利用,以估算整个项目的建设成本和持续时间。从Kaponig 2.75公里的探索性隧道收集数据,这是奥地利双轨高速铁路开发的一部分。这种知识和经验用于评估与最终隧道放大的设计细节相关的风险(对准和等级,支持要求和挖掘方法)。基于Monte-Carlo模拟的确定性模型,能够在成本和持续时间和相关概率方面预测总项目的潜在结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号