首页> 外文会议>Annual conference of the Transportation Association of Canada >A Process Management Approach to Fund Safety Projects in Alberta
【24h】

A Process Management Approach to Fund Safety Projects in Alberta

机译:艾伯塔省资助安全项目的流程管理方法

获取原文

摘要

Within a roadway agency, a capital plan usually includes traditional programs such as pavement rehabilitation, roadway capital improvement, new capital projects and other ancillary features. With declining annual budgets in a context of increasing needs for various programs, new safety programs are usually difficult to accommodate. Decision makers must be presented with a strong business case to decide to incorporate new programs in the capital plan. The science of roadway safety has gained increased recognition over the last 15 years. During this period, Transportation Association of Canada (TAC) and other agencies have developed various safety engineering guidelines such as road safety audit, in-service road safety review and 3R/4R guidelines. Also, the explicit evaluation of safety considerations in selecting geometric parameters is encouraged throughout the current TAC Geometric Design Guide for Canadian Roads. However, funding of road safety projects has not met with the same degree of success. In a process management context, development of road safety standards and guidelines is only one of the key activities. Other activities, such as policy development, planning, program development, education, research and training must all take place as well in order to successfully deliver road safety programs. The goal of this process management approach is to secure on-going annual funding for safety projects throughout the highway network in an equitable and cost effective way. The ultimate objective is to achieve a reduction in collision rates and average collision severities resulting in a significant decrease in societal costs for collisions. This will reduce pressure on the province's health care and emergency services. These highway improvements will continue to provide enhanced safety for the general public as long as the infrastructure element is in service. This paper describes a process management approach that has been used effectively to implement various road safety projects and programs over the last 15 years in Alberta, Canada. Road safety projects such as 3R/4R improvements, shoulder rumble strips, railway crossing improvement, safety rest areas, traffic operation safety improvements and other safety projects are now incorporated into Alberta Infrastructure and Transportation's normal planning and programming process. This paper provides details on how these programs and projects were developed from conception to implementation stage despite institutional barriers and challenges.
机译:在巷道机构内,资本计划通常包括路面康复,道路资本改进,新资本项目等辅助特征等传统计划。随着年度预算下降在增加各种方案的需求的背景下,新的安全计划通常难以容纳。决策者必须提供强大的业务案件,以决定在资本计划中纳入新计划。巷道安全科学在过去15年中获得了更高的认可。在此期间,加拿大(TAC)和其他机构的交通协会制定了各种安全工程准则,如道路安全审计,在职的道路安全审查和3R / 4R指南。此外,在加拿大道路的当前TAC几何设计指南中,鼓励在选择几何参数中的安全考虑因素的明确评估。但是,道路安全项目的资金尚未满足相同程度的成功。在流程管理背景下,道路安全标准和指南的发展只是关键活动之一。其他活动,如政策制定,规划,计划开发,教育,研究和培训,也必须进行,以便成功提供道路安全计划。该流程管理方法的目标是以公平且成本效益的方式确保整个公路网络的安全项目进行持续的年度资金。最终目标是实现碰撞率的降低和平均碰撞严重程度,导致碰撞的社会成本显着降低。这将减少全省医疗保健和紧急服务的压力。只要基础设施元素在服务中,这些公路的改进将继续为公众提供增强的安全性。本文介绍了一种过程管理方法,这些方法已经有效地用于在加拿大艾伯塔省的过去15年中实施各种道路安全项目和计划。道路安全项目,如3R / 4R改进,肩部隆隆条,铁路交叉改善,安全休息区,交通运行安全改进等安全项目现已纳入艾伯塔省基础设施和运输的正常规划和编程过程。本文提供了详细信息,详细了解这些计划和项目如何从概念到实施阶段制定,尽管体制障碍和挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号