首页> 外文会议>SPE/PS-CIM/CHOA international thermal operations and heavy oil symposium >The Challenge Facing Multiphase Metering in Oil-Sands Thermal Developments
【24h】

The Challenge Facing Multiphase Metering in Oil-Sands Thermal Developments

机译:油砂热发射多相测光面临的挑战

获取原文

摘要

Multiphase metering flow meters (MPFM) are being accepted more and more in oil and gas developments, replacing test separators, particularly on fields with large well networks. This is the case with Steam Assisted Gravity Drainage (SAGD) oil sands developments requiring large capital investment that need accurate production and reservoir data and have difficult processing techniques. This data includes: 1. Real time measurement: good reservoir and steam chamber monitoring and steam injection versus oil production surveys. 2. Cost reduction: steam oil ratio (SOR) optimisation, due to the economic and environmental cost of steam. 3. Asset integrity: mitigation of the risk of steam breakthrough in oil producer wells.
机译:多相计量流量计(MPFM)在石油和天然气的开发中被接受越来越多,更换测试分离器,特别是在具有大型网络的领域。这是蒸汽辅助重力排水(SAGD)油砂的情况,需要大资本投资,需要准确生产和储层数据,并具有困难的加工技术。该数据包括:1。实时测量:良好的水库和蒸汽室监测和蒸汽注射与石油生产调查。 2.降低成本:由于蒸汽的经济和环境成本,蒸汽油比(SOR)优化。 3.资产诚信:减轻石油生产者井中蒸汽突破风险的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号