首页> 外文会议>European Facility Management Conference >Public Private Partnership (PPP) on the example of the contract: 41 schools of the District Offenbach
【24h】

Public Private Partnership (PPP) on the example of the contract: 41 schools of the District Offenbach

机译:公共私人伙伴关系(PPP)在合同的例子中:41所学区Offenbach

获取原文

摘要

Cycle orientated planning of Maintenance and Energy Management With the first draft of constructing a project, one has to consider the effect and consequences when maintaining and operating a property. Construction and choice of material are intimately connected. Without neglecting the aesthetic aspects of a property the focus has to be on sustainable maintenance. The aim is to reach efficient running costs. Multifunctional equipped premises provide a flexible use. Capacities of vacant premises can be utilised more efficiently. The prior aim is the economical and responsible use of energy and water. It is essential to plan energy saving systems in the developing stage. Selective energy management reduces the energy use. Cost reduction can be reached by recording and calculating the consumptions values to decrease the energy consumption.
机译:循环定向维护和能源管理规划与建设项目的初稿,一个人必须考虑维护和运营财产时的效果和后果。施工和材料的选择密切相关。不忽视财产的审美方面,重点必须是可持续的维护。目的是达到高效的运行成本。多功能设备提供灵活使用。空置房屋的能力可以更有效地利用。前目的是能源和水的经济负责。在发展阶段计划节能系统至关重要。选择性能量管理减少了能源使用。通过录制和计算消费值来降低能量消耗来达到成本降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号