Design and Construction of a Hydro -Wind Hybrid Renewable Power Stationin Iowa Hickory Hills State Park

机译:水电 - 风杂交山脉卫星山上山上山上山上公园的设计与施工

获取原文

摘要

The objective of this applied research project is to design and construct a small-scale hydroelectric and wind power station for generating zero-emission electricity for cabins and RV outlets in Hickory Hills park located in La Porte City, Iowa. The project consists of three phases. Phase 1, a feasibility study for the wind and water resource availability, which was completed last year. Phase 2 is an ongoing design and construction of the entire mechanical systems, which began in September 2004 and is to be completed by May 1, 2005. The final phase (Phase 3) includes the following: (1) completion of wiring of the electrical systems in power house; (2) analysis of the occupational safety and health administration (OSHA) rules as applied to the project, (3) operation of the hydro and wind system; (4) completion of field test measurements, and observation of daily average power readings; (5) collecting data on environmental savings and air quality improvement; and (6) report of results to the Black Hawk County Conservation Board and local media.
机译:该应用研究项目的目的是设计和建造一个小型水电和风力发电站,用于为位于爱荷华州洛杉矶波特市的山内山公园的山上和RV出口产生零排放电力。该项目由三个阶段组成。第1阶段,对天空资源可用性的可行性研究,该资源可用于去年完成。第2阶段是持续的设计和构造整个机械系统,该系统始于2004年9月1日,并于2005年5月1日完成。最终阶段(第3阶段)包括以下内容:(1)完成电气布线电力房屋中的系统; (2)分析适用于项目的职业安全和健康管理局(OSHA)规则,(3)水电系统的运作; (4)完成现场测试测量,并观察日平均功率读数; (5)收集有关环境储蓄和空气质量改进的数据; (6)结果向黑鹰县保护委员会和当地媒体报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号